English
français
Deutsche
Italian
русский
Español
português
Ελληνικά
日本語
한국어
简体中文
عربى
Home > News > Industry News > Condition industrial chiller installation site requirements
News
Certifications
Latest news
Contact Us
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support.
Contact Now

Industry News

Condition industrial chiller installation site requirements

AMC AMC 2016-01-19 11:01:52
1, the refrigerator away from the fire source and combustibles. If and when the boiler and the heating element is provided, so pay attention and consider the impact of thermal radiation.
2, at room temperature as far as possible below 40 ℃, and the need for good ventilation, when if the temperature at 40 ℃ ambient relative humidity so it must be 90% or less. Never outdoor or outdoor installation, storage.
3, the installation site should try to select a place with minimal dust deposit.
4, better lighting installation site, in order to facilitate future maintenance and inspection.
5, around the crew must leave sufficient space for future maintenance, repair and cleaning evaporator - condenser tubes and so on.
6, the engine room and around the entire unit can be completely drained to ensure.
To prevent corrosion of parts unit footing, so the drainage around the unit must be good, and machine base plate base plane to smooth, specific requirements are as follows:
1, the maximum height difference between the base plane not exceed 3mm,
2, the refrigeration unit needs to be set around the drains,
3, the ground level as far as possible greater than 100mm, for easy maintenance and inspection of the refrigerator.