English
français
Deutsche
Italian
русский
Español
português
Ελληνικά
日本語
한국어
简体中文
عربى
Home > News > Industry News > AMC belt line operation
News
Certifications
Latest news
Contact Us
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support.
Contact Now

Industry News

AMC belt line operation

AMC AMC 2016-08-17 10:33:00
Before the belt line operation, first make sure the belt line equipment, personnel, conveyed articles are in safe intact state; Second, check all moving parts normally no foreign matter, check all electrical wiring is normal to the belt line into operation correctly. Finally, to check the difference between the supply voltage and the rated voltage does not exceed ± 5%.
In the belt line put into operation, you must do the following:
1. Close the main power switch, check the device power is being fed properly and the power indicator light. The next step is normal.
2. Close each circuit of the power switch, check whether it is normal. Under normal conditions it is: the power light does not operate equipment, belt line running light is not on, the inverter and other equipment, light, drive a display panel shows normal (no fault code display).
3. In accordance with the process to start up all the electrical equipment, electrical equipment on after a normal start (motor or other device is up to speed, the normal state) and then the next start of electrical equipment.
In the belt line operation, it must comply with the provisions of articles designed to be transported in the article, comply with design capacity of the belt line. Secondly, we must pay attention to all kinds of people can not touch the moving parts of the belt-line, non-professionals are not free contact with electrical components, control buttons. Finally, you can not run at the belt line of the inverter stage circuit, such as determining maintenance needs, it must be carried out in the stop frequency operation, otherwise may damage the inverter.
Belt line run stop, press the stop button until the system can only cut off the main power stopped.