- Browse Categories
- Certifications
-
- Subscribe
-
Get new product information
- Latest news
-
-
Why the Curve Matters More Than the Temperature of Cooling Tunnel
-
The Staged Cooling Solution of Cooling Tunnel
-
What Happens Inside a One-Zone Cooling Tunnel
-
Cooling Tunnel Common Selection Mistakes to Avoid
-
Why Cooling Tunnel Length Matters
-
How to Protect Your Temper Through the Tunnel
-
The Four Ways a Cooling Tunnel Destroys Perfect Tempering
-
Why Perfectly Tempered Chocolate Fails the Moment It Leaves the Cooling Tunnel
-
Why Staged Cooling Matters in Cooling Tunnel?
-
How Chocolate Cooling Tunnels Work: The Complete Guide to Perfect Crystallization
-
- Hot Products
- Best Selling Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
Supplier Stainless steel snack conveyor jelly cooling tunnel
- Condition: New Place of Origin: Jiangsu, China (Mainland)
- Brand Name: AMC-jelly cooling tunnel
- Model Number: AMC-CCT91
- Application: Petroleum jelly,lipstick
- Voltage: 220V/380V/420V
- Power(W): 25KW~65KW
- Weight: 5T Dimension(L*W*H): 16*1.75*1.08M
- Certification: CE.TUV
- Warranty: 1years
- After-sales Service Provided: Engineers available to service machinery overseas
- Material of Frame: Stainless Steel 304/316
- Material of Belt: Slat bel conveyor for food grade
- Power: 11KW Compressor: Bitzer/ Copeland
- Speed: Adjustable Motor: SEW or Chinese brand
- Pneumatic: SMC or Chinese brand Cover: Each side can be opened Package: wooden case for jelly cooling tunnel
Product Description
|
Type |
Air-cooled / Water-cooled |
|
Weight |
150Kg/Hr |
|
Capacity |
100-1500Kg/Hr |
|
Speed |
Adjustable 1~15 M/min |
|
Voltage |
220V/380V |
|
Power |
10-45KW |
|
Tunnel Temp |
>3℃ |
|
Material of Frame |
Stainless Steel for jelly cooling tunnel |
|
Material of Belt |
PU Belt ,and snack conveyor (Food industry and chemical ) |
|
Application |
Food/chemical Industrial Cooling |
|
Drive Motor |
SEW / CPG 1.1~5.5KW |
|
Compressor |
BITZER / SHUANGLING 5~25 Hp |
|
Condenser |
BITZER / SHUANGLING |
|
Warranty |
1 Year for jelly cooling tunnel |
|
Package |
Wooden Case for jelly cooling tunnel |
|
Holding Time |
1~60 min for jelly cooling tunnel |
|
Control Models |
PLC & Touch Pannel |
|
Working Temp |
-10~10 ℃ |
|
Common Size |
1150/1450/1750mm |
a. Production capacity: 100~10000kg/h
b. Cooling temp.: -10~10 degree
c. Hilding time: 1~60 min
d. Control models: PLC & Touch pannel
a. Modular solutions combining a range of size, features and cooling elements to suit any application from fragile filled chocolates and cream goods to bars and coated biscuit
b. Radiation, conduction, and conduction cooling
c. Precision temperature contrl
d. Energy efficiency and environmental safety
e. Attractive design with easy cleaning and maintenance
f. Airflow, insulation and hood design for temperature consistency across the entire band width
a. Adjustable infeed tanle
b. FDA-approved band
c. Automatic centering
d. Cooling section
e. Cooling unit
f. Cover
g. Drive unit
h. Base
1. Moulds cycle moving in the cubical space, auto in & out, no joint chains, so its very easy to change the products.
2. Small area covered, which saves the factory space.
3. Good cooling performance, small space of moulds moving, high cooling efficiency to the products.
4Intellectual controlling, which can match the depositor and control the temperature automatically.

Remark:
1. Delivery Time:
Within 60 Days upon the receipt of the deposit.
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based
on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip
air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money
to our technicians.
1.provide you OEM/ OEM service,and technology supporting
2.after sales service
3.any feedback received will reply you in 24hrs.












