Cost Saving China Top10 Manufacturer Wafer Biscuit Chocolate Sterilizing Full Automatic Cooling Tunnel Machine
- Condition:New
- Place of Origin:Jiangsu, China (Mainland)
- Brand Name:AMC-Cooling Tunnel System
- Model Number:AMC-070
- Application:Chocolate,Pizza, etc.
- Voltage:220V/380V
- Power(W):10-45kw
- Weight:Customized
- Dimension(L*W*H):Customized
- Certification:TUV,ISO,CE
- Warranty:1 year
- After-sales Service Provided:Engineers available to service machinery overseas
- name:Cooling Tunnel System
- Tunnel Temp:>3℃
- Speed:Adjustable
- Holding Time:1-60min
- Control Models:PLC & Touch Panel
- Capacity:100-2000Kg/Hr
- Material of Frame:Stainless steel
- Material of Belt:White PU Belt (Food industry)
| Name |
Cooling Tunnel Machine |
|
Weight |
150Kg/M |
|
Capacity |
100-2000Kg/Hr |
|
Speed |
Adjustable 1~15 M/min |
|
Voltage |
220V/380V |
|
Power |
10-45KW |
|
Tunnel Temp |
>3℃ |
|
Material of Frame |
Stainless Steel |
|
Material of Belt |
White PU Belt (Food industry) |
|
Application |
Food Industrial Cooling |
|
Drive Motor |
SEW / CPG 1.1~5.5KW |
|
Compressor |
BITZER / COPELAND 5~25 Hp |
|
Condenser |
BITZER / COPELAND |
|
Warranty |
1 Year |
|
Package |
Wooden Case |
|
Holding Time |
1~60 min |
|
Control Models |
PLC & Touch Panel |
|
Working Temp |
-10~10 ℃ |
|
Common Size |
W=1150/1450/1750(mm) |
Advantage:
a. Specializing in this cooling tunnel field for more than 10 years, Have been the Global Supplier of multinational companies.
b. Have own R&D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
d. CE,TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
h. Precise temperature control by separated zone used.
Benefit:
1. Consistency and flexibility.
2. Innovation.
3. Easy Clean and Maintenance.
4. Nice Appearance.
5. Reliability and Service.
6. Energy Saving and Environmental Protection.
7. Precise temperature control.
Image:
Package:
Wooden Case will be used if no special requirements.


Delivery & Payment:
1. Delivery Time:
60 working days after receiving payment
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us:




Company activities:

