Cooling Tunnel System
Name |
Cooling Tunnel Machine
|
Weight
|
150Kg/M
|
Capacity
|
100-2000Kg/Hr
|
Speed
|
Adjustable 1~15 M/min
|
Voltage
|
220V/380V
|
Power
|
10-45KW
|
Tunnel Temp
|
>3℃
|
Material of Frame
|
Stainless Steel
|
Material of Belt
|
White PU Belt (Food industry)
|
Application
|
Food Industrial Cooling
|
Drive Motor
|
SEW / CPG 1.1~5.5KW
|
Compressor
|
BITZER / COPELAND 5~25 Hp
|
Condenser
|
BITZER / COPELAND
|
Warranty
|
1 Year
|
Package
|
Wooden Case
|
Holding Time
|
1~60 min
|
Control Models
|
PLC & Touch Panel
|
Working Temp
|
-10~10 ℃
|
Common Size
|
W=1150/1450/1750(mm)
|
Advantage:
a. Specializing in this cooling tunnel field for more than 10 years, Have been the Global Supplier of multinational companies.
b. Have own R&D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
d. CE,TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
h. Precise temperature control by separated zone used.
Benefit:
1. Consistency and flexibility.
2. Innovation.
3. Easy Clean and Maintenance.
4. Nice Appearance.
5. Reliability and Service.
6. Energy Saving and Environmental Protection.
7. Precise temperature control.
Image:
Package:
Wooden Case will be used if no special requirements.
Delivery & Payment:
1. Delivery Time:
60 working days after receiving payment
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us:
Company activities:
|