English
français
Deutsche
Italian
русский
Español
português
Ελληνικά
日本語
한국어
简体中文
عربى
Home > Category > Cooling Tunnel > Chocolate cooling tunnel  > high quality stainless steel cooling tunnel
Browse Categories
Certifications
Latest news
Contact Us
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support.
Contact Now
high quality stainless steel cooling tunnelhigh quality stainless steel cooling tunnelhigh quality stainless steel cooling tunnel

high quality stainless steel cooling tunnel

  • Place of Origin: Jiangsu, China (Mainland)
  • Brand Name: AMC-cooling tunnel
  • Model Number: AMC-CCM04
  • Type: Meat Processing Machinery
  • After-sales Service
  • Provided: Engineers available to service machinery overseas
  • material: stainless steel304
  • Processing Types: choclate Product Processing: coating the natural cocoa butter
  • size1: 18000*800*1000mm
  • Belt speed: 1-15m/min
  • mesh width: 350/550/750mm
  • net weight: 3600kg
  • advanced: TUV/ISO9001
  • cooling length: 10m or more
high quality stainless steel cooling tunnel

1.Parament:
a. Production capacity: 100~10000kg/h

b. Cooling temp.: -10~10 degree

c. Hilding time: 1~60 min

d. Control models: PLC & Touch pannel

a. Modular solutions combining a range of size, features and cooling elements to suit any application from fragile filled chocolates and cream goods to bars and coated biscuit

b. Radiation, conduction, and conduction cooling

c. Precision temperature contrl

d. Energy efficiency and environmental safety

e. Attractive design with easy cleaning and maintenance

f. Airflow, insulation and hood design for temperature consistency across the entire band width

a. Adjustable infeed tanle

b. FDA-approved band

c. Automatic centering

d. Cooling section

e. Cooling unit

f. Cover

g. Drive unit

h. Base


1. Moulds cycle moving in the cubical space,  auto in & out, no joint chains, so its very easy to change the products.

2. Small area covered, which saves the factory space.

3. Good cooling performance, small space of moulds moving, high cooling efficiency  to the products.

4Intellectual controlling,  which can match the depositor and control the temperature automatically.

Remark:

1Delivery Time:

Within 60 Days upon the receipt of the deposit.

 

2.Terms of payment:

50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.

 

3. Testing & Training (If you need):

The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.


AMC hold activities for cooling tunnel




Tag:
AMC

Tel:whatsapp +8613004597814

Contact Person:Aimee Li

Send Inquiry
captcha