Industrial chiller is used to control the products, mechanisms and factory machinery cooling industries. They are typically used in plastic injection molding and blow molding industry, metal working cutting oils, welding equipment, die-casting and machining, chemical processing, pharmaceutical formulation, food and beverage processing, paper making, cement processing, vacuum systems, X-ray diffraction, electrical supply and power stations, analysis equipment, semiconductors, compressed air and gas cooling. They are also used to cool high heat, such as magnetic resonance imaging and laser special projects, and in hospitals, hotels and schools.
Chiller GF uneven application marks the operator of technology, it is likely due to improper operation or reduce damage to the chiller performance chiller. Let us say that the partial chiller operation aspect to note is.
1, when the unit is installed, must wait 15 minutes after the start, in order to ensure safe operation of the compressor.
2, the operation want to re-open the cooler, please re-open interval of three minutes. If the number of frequent starts and short interval of time could easily lead to damage to the cooler.
3, the chiller is prohibited inclined applicable, to avoid injuries, leaks or electric shock situation.
4, the power distribution box before starting to do the ground fortifications and make it drain piping erection.
5. Do not open the control box door operation, in order to avoid condensation. In operation when colleagues also do not open the control box door.
6, if the evaporator frost happens, stop cooling machine, to be confirmed before starting exclude frost. If it continues to run after the frost, easy to shorten compressor life and cause a malfunction.
7, there are unusual circumstances or smell (smelling odors), stop the operation immediately check the chiller, to prevent electric shock or fire.
Chiller GF uneven application marks the operator of technology, it is likely due to improper operation or reduce damage to the chiller performance chiller. Let us say that the partial chiller operation aspect to note is.
1, when the unit is installed, must wait 15 minutes after the start, in order to ensure safe operation of the compressor.
2, the operation want to re-open the cooler, please re-open interval of three minutes. If the number of frequent starts and short interval of time could easily lead to damage to the cooler.
3, the chiller is prohibited inclined applicable, to avoid injuries, leaks or electric shock situation.
4, the power distribution box before starting to do the ground fortifications and make it drain piping erection.
5. Do not open the control box door operation, in order to avoid condensation. In operation when colleagues also do not open the control box door.
6, if the evaporator frost happens, stop cooling machine, to be confirmed before starting exclude frost. If it continues to run after the frost, easy to shorten compressor life and cause a malfunction.
7, there are unusual circumstances or smell (smelling odors), stop the operation immediately check the chiller, to prevent electric shock or fire.