- Browse Categories
- Certifications
-
- Subscribe
-
Get new product information
- Latest news
-
-
What Happens Inside a One-Zone Cooling Tunnel
-
Cooling Tunnel Common Selection Mistakes to Avoid
-
Why Cooling Tunnel Length Matters
-
How to Protect Your Temper Through the Tunnel
-
The Four Ways a Cooling Tunnel Destroys Perfect Tempering
-
Why Perfectly Tempered Chocolate Fails the Moment It Leaves the Cooling Tunnel
-
Why Staged Cooling Matters in Cooling Tunnel?
-
How Chocolate Cooling Tunnels Work: The Complete Guide to Perfect Crystallization
-
What Is a Soft Serve Ice Cream Machine?
-
Best Ice Cream Machine for Ice Cream Shop Startup: A Complete Buyer’s Guide
-
- Hot Products
- Best Selling Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
AMC high quality low price vaseline cooling tunnel
- Place of Origin: Jiangsu, China (Mainland)
- Type: Meat Processing Machinery
- After-sales Service
- Provided: Engineers available to service machinery overseas
- material: stainless steel304
- Processing Types:vaseline ,shoe polish, costmetic
- size1: 12000*1650*1800mm
- Belt speed: 1-15m/min
- PU width: 350/550/750mm
- net weight:8000kg
- advanced: TUV/ISO9001
- cooling length: 10m or more
AMC new quality with good price vaseline cooling tunnel
|
Type |
Air-cooled / Water-cooled |
|
Weight |
150Kg/Hr |
|
Capacity |
100-1500Kg/Hr |
|
Speed |
Adjustable 1~15 M/min |
|
Voltage |
220V/380V |
|
Power |
10-45KW |
|
Tunnel Temp |
>3℃ |
|
Material of Frame |
Stainless Steel |
|
Material of Belt |
PU Belt (Food industry and chemical ) |
|
Application |
Food/chemical Industrial Cooling |
|
Drive Motor |
SEW / CPG 1.1~5.5KW |
|
Compressor |
BITZER / SHUANGLING 5~25 Hp |
|
Condenser |
BITZER / SHUANGLING |
|
Warranty |
1 Year for chemical cooling tunnel |
|
Package |
Wooden Case for vaseline cooling tunnel |
|
Holding Time |
1~60 min for vaseline cooling tunnel |
|
Control Models |
PLC & Touch Pannel |
|
Working Temp |
-10~10 ℃ |
|
Common Size |
1150/1450/1750 |

Delivery & Payment
Remark:
1. Delivery Time:
Within 60 Days upon the receipt of the deposit.
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
Our Services
1.provide you OEM/ OEM service,and technology supporting
2.after sales service
3.any feedback received will reply you in 24hrs.

AMC hold activities for cooling tunnel:












