- Browse Categories
- Certifications
-
- Subscribe
-
Get new product information
- Latest news
-
-
How to Choose the Right Cooling Tunnel?
-
The Advantages and Limitations of Combined Cooling
-
How Air-Water Combined Cooling Tunnels Works?
-
The Limitations of Water Cooling
-
How Water Cooling Works?
-
The Limitations of Air Cooling Tunnel
-
The Advantages of Air Cooling Tunnel
-
How Cooling Tunnels Work?
-
Why Staged Cooling Beats a Single Cold Blast by a Factor of Ten Thousand?
-
Implementation Checklist of Cooling Tunnel
-
- Hot Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
Best sell cheapest easy operation stainless steel cake and bread cooling tunnel
- Place of Origin: Jiangsu, China (Mainland)
- Type: Meat Processing Machinery
- Provided: Engineers available to service machinery overseas
- material: stainless steel304
- Processing Types: choclate Product Processing: coating the natural cocoa butter
- size1: 15000*800*1000mm
- Belt speed: 1-3m/min
- mesh width: 350/550/750mm
- net weight: 3600kg
- advanced: TUV/ISO9001
cheapest stainless steel cooling tunnel for cake
1.parament:
|
Type |
Air-cooled / Water-cooled |
|
Weight |
150Kg/Hr |
|
Capacity |
100-1500Kg/Hr |
|
Speed |
Adjustable 1~15 M/min |
|
Voltage |
220V/380V |
|
Power |
10-45KW |
|
Tunnel Temp |
>3℃ |
|
Material of Frame |
Stainless Steel |
|
Material of Belt |
PU Belt (Food industry and chemical ) |
|
Application |
Food/chemical Industrial Cooling |
|
Drive Motor |
SEW / CPG 1.1~5.5KW |
|
Compressor |
BITZER / SHUANGLING 5~25 Hp |
|
Condenser |
BITZER / SHUANGLING |
|
Warranty |
1 Year for cooling tunnel for cake |
|
Package |
Wooden Case for jelly cooling tunnel |
|
Holding Time |
1~60 min |
|
Control Models |
PLC & Touch Pannel |
|
Working Temp |
-10~10 ℃ |
|
Common Size |
1150/1450/1750mm |

Remark:
1. Delivery Time:
Within 60 Days upon the receipt of the deposit.
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
Our Services
1.provide you OEM/ OEM service,and technology supporting
2.provide after sales service for cooling tunnel for cake
3.any feedback received will reply you in 24hrs.
FAQ
1. Quick shipment once we received the payment.
2. Production tracking day by day, we can offer photos from our product-lines, for your reference,only;
3. Complain from the customer, will handle by our sales directly and 48 hrs reply once the problems had.












