Why Staged Cooling Beats a Single Cold Blast by a Factor of Ten Thousand?
-
Implementation Checklist of Cooling Tunnel
-
Why the Curve Matters More Than the Temperature of Cooling Tunnel
-
The Staged Cooling Solution of Cooling Tunnel
-
What Happens Inside a One-Zone Cooling Tunnel
-
Cooling Tunnel Common Selection Mistakes to Avoid
-
Why Cooling Tunnel Length Matters
-
How to Protect Your Temper Through the Tunnel
-
The Four Ways a Cooling Tunnel Destroys Perfect Tempering
-
Why Perfectly Tempered Chocolate Fails the Moment It Leaves the Cooling Tunnel
-
- Hot Products
- Best Selling Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
High quality stainless steel factory price chocolate processing storage tank
- Condition: New
- Place of Origin: Jiangsu, China (Mainland)
- Application: Chocolate
- Voltage: 220V/380V Power(W): 2.2kw
- Weight: 1000kg
- Dimension(L*W*H): 1220*1250mm
- Certification: CE ISO9001
- Electric Heating Power: 4kw
- Payment Term: T/T
- Capacity: 1000L
- Net weight: 1000kg
- Rotation Rate: 24r/min
- Product type: chocolate machine Material: Food Grade Stainless Steel
- Function: Temperature decrease,rise and presercation
AMCG500 Factory providing chocolate processing line storage tank
Product Description
1.Materials:
All parts contact with foods and the machine’s whole frame are made by stainless steel.
2.Features:
(1).It’s in the chocolate production necessary equipment, mainly uses in after the correct grinding chocolate syrup heat preservation storing, satisfies the chocolate production the technological requirement, adapts the continuous production request.
(2).This product also has functions of temperature decrease ,rise and preservation .Besides,it also has fuctions of preventing fat separation.
|
Stype |
Capacity (L) |
Net Weight (kg) |
Motor Power (kw) |
Electric Heating Power (kw) |
Dimension (mm) |
Rate (r/min) |
|
AMCG200 |
200 |
180 |
1.1 |
4 |
800*1250 |
24 |
|
AMCG300 |
300 |
200 |
1.1 |
4 |
900*1250 |
24 |
|
AMCG500 |
500 |
600 |
1.5 |
4 |
1000*1380 |
24 |
|
AMCG1000 |
1000 |
1000 |
2.2 |
4 |
1220*1850 |
24 |
|
AMCG2000 |
2000 |
1500 |
3 |
6 |
1400*2500 |
24 |
|
AMCG5000 |
5000 |
3000 |
7.5 |
6 |
2000*2710 |
24 |
3. Pictures:

Packaging & Shipping
1. 40-60 days after receiving the deposit.
2. By sea.

Our Services
1.Delivery Time:
Within 15 days after receiving the payment.
2. Terms of payment:
50%T/T in advance, the balance shall be paid before the shipment .The above price is based on current exchange rate, if the exchange rate changed 2%, we can’t keep the price.
3. Others:
Testing and training (if you need)
The plant layout design .assembly ,installation and debugging ,start-up and local team training will be Free at no cost .But the buyer should be responsible for the round-trip air tickets ,local transportation, board & lodging and USD$45/day/person for the pocket money to our technicians ,
Utilities:
The buyer should prepare sufficient electric power and other equipment supplies which are suitable to be connected to our machinery before our engineers start off.
Validity:
This quotation is valid 60 days .But if the exchange rate between USD and RMB change sharply, the price will be adjusted accordingly.
Company Information



FAQ
1. Quick shipment once we received the payment.
2. Production tracking day by day, we can offer photos from our product-lines, for your reference,only;
3. Complain from the customer, will handle by our sales directly and 48 hrs reply once the problems had.
Our trade assurance amount is $38000