- Browse Categories
- Certifications
-
- Subscribe
-
Get new product information
- Latest news
-
-
What Happens Inside a One-Zone Cooling Tunnel
-
Cooling Tunnel Common Selection Mistakes to Avoid
-
Why Cooling Tunnel Length Matters
-
How to Protect Your Temper Through the Tunnel
-
The Four Ways a Cooling Tunnel Destroys Perfect Tempering
-
Why Perfectly Tempered Chocolate Fails the Moment It Leaves the Cooling Tunnel
-
Why Staged Cooling Matters in Cooling Tunnel?
-
How Chocolate Cooling Tunnels Work: The Complete Guide to Perfect Crystallization
-
What Is a Soft Serve Ice Cream Machine?
-
Best Ice Cream Machine for Ice Cream Shop Startup: A Complete Buyer’s Guide
-
- Hot Products
- Best Selling Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
Leading China customized newest easy operation food industry cheese making machine cooling tunnel
- Condition: New
- Place of Origin:Jiangsu, China (Mainland)
- Application: Biscuit, Chocolate, Candy, etc.
- Food industrial Cooling Voltage: 220V / 380V
- Power (W): 10 - 65kw
- Weight:150 KG/M
- Dimension(L*W*H):depend on customers
- Certification: CE
- Tunnel Temp:0 - 10℃
- Material of frame:Stainless Steel
- Material of belt:PU conveyor belt/mesh belt
Features:
|
Type |
Air-cooled / Water-cooled |
|
Weight |
150 kg.M |
|
Capacity |
100-2000 kg/Hr |
|
Speed |
Adjustable 1 ~ 15 M/min |
|
Voltage |
220V/380V |
|
Power |
10 65KW |
|
Tunnel Temp |
0 ~ 10℃ |
|
Material of Frame |
Stainless Steel |
|
Material of Belt |
White PU Belt (Food industry) |
|
Application |
Food Industrial Ccooling |
|
Drive Motor |
SEW / CPG 1.1 ~ 5.5KW |
|
Compressor |
BITZER. COPELAND 5 ~ 25 Hp |
|
Condense |
BITZER. COPELAND |
|
Warranty |
1 Year |
|
Package |
Wooden box |
|
Holding Time |
1 ~ 60 min |
|
Models control |
PLC & Touch Panel |
|
Working Temp |
-10 ~ 10 ℃ |
|
Common Size |
W =1750-1450-1150(mm) |
Advantage:
a. Specializing in this field for more than 10 years, Have been the Global Supplier of multinational companies.
b. Have own R & D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
CE, TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
(h). Precise temperature control by separated area used.
Benefit:
1 Consistency and flexibility.
2. innovation.
3 Easy Clean and Maintenance.
4 Nice Appearance.
5 Reliability and Service.
6 Energy Saving and Environmental Protection.
7. Precise temperature control.
DeTail Image:

Package:
Wooden box will be used if no. special requirements.

Delivery & Payment:
1 Delivery Time:
60 working days after receiving payment
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up local and team training will be Free at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us:











