- Browse Categories
- Certifications
-
- Subscribe
-
Get new product information
- Latest news
-
-
Why Staged Cooling Beats a Single Cold Blast by a Factor of Ten Thousand?
-
Implementation Checklist of Cooling Tunnel
-
Why the Curve Matters More Than the Temperature of Cooling Tunnel
-
The Staged Cooling Solution of Cooling Tunnel
-
What Happens Inside a One-Zone Cooling Tunnel
-
Cooling Tunnel Common Selection Mistakes to Avoid
-
Why Cooling Tunnel Length Matters
-
How to Protect Your Temper Through the Tunnel
-
The Four Ways a Cooling Tunnel Destroys Perfect Tempering
-
Why Perfectly Tempered Chocolate Fails the Moment It Leaves the Cooling Tunnel
-
- Hot Products
- Best Selling Products
- Contact Us
-
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support. Contact Now
OEM Stainless Steel Cooling tunnel for Cosmetic
- Condition:New
- Place of Origin:Jiangsu, China (Mainland)
- Brand Name:AMC-Cooling tunnel
- Model Number:AMC-127
- Application:Biscuit,Chocolate,Candy,Cake etc., Cosmestic
- Voltage:220V/380V
- Power(W):10-45kw
- Weight:150KG/Meter
- Dimension(L*W*H):depend on customers
- Certification:ISO,CE,TUV
- Warranty:1 year
- After-sales Service Provided:Engineers available to service machinery overseas
- Material of frame:Stainless Steel
- Tunnel Temp:0-10℃
OEM Stainless Steel Cooling tunnel for Cosmetic
Advantage:
a. Specializing in this field for more than 10 years, Have been the Global Supplier of multinational companies.
b. Have own R&D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
d. CE,TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
h. Precise temperature control by separated zone used.
Benefit:
1. Consistency and flexibility.
2. Innovation.
3. Easy Clean and Maintenance.
4. Nice Appearance.
5. Reliability and Service.
6. Energy Saving and Environmental Protection.
7. Precise temperature control.
Detail Image:

Package:
Wooden Case will be used if no special requirements.


Delivery & Payment:
1. Delivery Time:
60 working days after receiving payment
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us:





Company activities:











