
Name |
Cooling Tunnel Machine |
Weight |
150Kg/M |
Capacity |
100-2000Kg/Hr |
Speed |
Adjustable 1~15 M/min |
Voltage |
220V/380V |
Power |
10-45KW |
Tunnel Temp |
>3℃ |
Material of Frame |
Stainless Steel |
Material of Belt |
White PU Belt (Food industry) |
Application |
Food Industrial Cooling |
Drive Motor |
SEW / CPG 1.1~5.5KW |
Compressor |
BITZER / COPELAND 5~25 Hp |
Condenser |
BITZER / COPELAND |
Warranty |
1 Year |
Package |
Wooden Case |
Holding Time |
1~60 min |
Control Models |
PLC & Touch Panel |
Working Temp |
-10~10 ℃ |
Common Size |
W=1150/1450/1750(mm) |
Advantage:
a. Specializing in this cooling tunnel field for more than 10 years, Have been the Global Supplier of multinational companies.
b. Have own R&D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
d. CE,TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
h. Precise temperature control by separated zone used.
Benefit:
1. Consistency and flexibility.
2. Innovation.
3. Easy Clean and Maintenance.
4. Nice Appearance.
5. Reliability and Service.
6. Energy Saving and Environmental Protection.
7. Precise temperature control.
Image:
Package:
Wooden Case will be used if no special requirements.
Delivery & Payment:
1. Delivery Time:
60 working days after receiving payment
2.Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the round-trip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us:
Company activities: