English
français
Deutsche
Italian
русский
Español
português
Ελληνικά
日本語
한국어
简体中文
عربى
Home > Category > Cooling Tunnel > Food cooling tunnel  > biscuit cooling tunnel from China manufacturer for kraft
Browse Categories
Certifications
Latest news
Contact Us
Globe strategic supplier of multinational companies.
Two of own plant for manufacture and pre-assembly.
Senior engineers for design and technical support.
Contact Now
biscuit cooling tunnel from China manufacturer for kraftbiscuit cooling tunnel from China manufacturer for kraftbiscuit cooling tunnel from China manufacturer for kraft

biscuit cooling tunnel from China manufacturer for kraft

  • material:stainless steel304
  • PU belt or stainless steel belt
  • stainless steel cover with good insulation
  • motor:SEW or Nord or chinese local
  • belt director control system to keep belt inline
  • Provide:OEM &ODM
  • certificate:TUV,SGS,BSCI
biscuit cooling tunnel from China manufacturer for kraft

a. Production capacity: 100~10000kg/h

b. Cooling temp.: -10~10 degree
c. Hilding time: 1~60 min
d. Control models: PLC & Touch pannel

a. Modular solutions combining a range of size, features and cooling elements to suit any application from fragile filled chocolates and cream goods to bars and coated biscuit
b. Radiation, conduction, and conduction cooling
c. Precision temperature contrl
d. Energy efficiency and environmental safety
e. Attractive design with easy cleaning and maintenance
f. Airflow, insulation and hood design for temperature consistency across the entire band width

a. Adjustable infeed tanle
b. FDA-approved band
c. Automatic centering
d. Cooling section
e. Cooling unit
f. Cover
g. Drive unit
h. Base

1. Moulds cycle moving in the cubical space,  auto in & out, no joint chains, so its very easy to change the products.

2. Small area covered, which saves the factory space.

3. Good cooling performance, small space of moulds moving, high cooling efficiency  to the products.

4Intellectual controlling,  which can match the depositor and control the temperature automatically.

Remark:

1Delivery Time:

Within 60 Days upon the receipt of the deposit.

 

2.Terms of payment:

50% T/T in advance, the balance shall be paid before the shipment. The above price is based 

on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.

 

3. Testing & Training (If you need):

The plant layout design, assembling, installation and debugging, start-up and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip 

air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money 

to our technicians.

 

Our Services

 

1.provide you OEM/ OEM service,and technology supporting

2.after sales service

3.any feedback received will reply you in 48hrs.  



Tag:
AMC

Tel:whatsapp +8613004597814

Contact Person:Aimee Li

Send Inquiry
captcha