Winter came, conveyor maintenance should pay attention to the problem, AMC for you to explain
AMC
AMC
2015-10-30 10:50:02
1, staff training programs and measures to master the relevant knowledge winter construction, as well as quality standards and operational points.
2, winter construction work to do skid, on ramps and pit road transport on the scaffold, to have reliable anti-skid measures, in addition to frost should be cleaned, but can still use sprinkle ashes, sawdust, sand and other methods of non-slip .
3, conveying confidential freezing measures taken to avoid damage to machinery and equipment, can not guarantee the normal operation.
4. Strengthen winter construction management measures, a clear job content and responsibilities winter construction. Clear job responsibilities of staff at all levels. Make sure that each step according to standards, norms, rules and technical measures to organize construction
AMC-quality production of food conveyor line equipment Chinese manufacturers, conveyor line products are exported around the world!